insight 1 | getting network capacity calculations right is critical
The initial 3G network configuration can accomodate a certain number of data subscriber without any significant incremental capacity related expenditures.

But soon additional CAPEX and OPEX will need to be spent for every single subscriber added on the network, representing a major share of overall mobile broadband production costs.
insights archive
Insight 13 (May 2011)

Video interview:
Mobile Data Challengers
Insight 12 (February 2011)
One-pager: To offload or not to offload? The existential dilemma of mobile operators
Insight 11 (November 2010)

Premium report:
Speed vs volume caps -
E-Plus Germany mobile data impact analysis report
Insight 10 (September 2010)

Free report:
Operator profits CAN be sustained even with twentyfold surge in mobile data traffic
Insight 9 (August 2010)

Free report:
Are cellular operators running out of spectrum?Case study for Helsinki, Berlin & Cairo
Insight 8 (February 2010)

Free report:
LTE | Turning point of telecom infrastructure sourcing models
Insight 7 (November 2009)
Free report:
Understanding the cost dynamics of mobile broadband
Insight 6 (October 2009)
One-pager: What is the tangible value of the HSPA+ feature?
Insight 5 (September 2009)
One-pager: Are your infrastructure vendor contracts "Gigabyte Ready"?
Insight 4 (August 2009)
One-pager: Watch out of growing demand of "normal" users
Insight 3 (July 2009)
One-pager: Understand cost implications of your market segments
Insight 2 (June 2009)
One-pager: Prepare for step increase in variable CAPEX per subscriber
Insight 1 (May 2009)
One-pager: Getting the network capacity calculations right is critical